Force Main

C Factor Testing

C Factor Testing

Why am I seeing an increase in my energy use at wastewater pump stations? Pump stations are often designed using a Hazen Williams C Factor of 120 for new force mains. Over time debris and a slime layer builds up on the interior surfaces of wastewater force mains resulting in a reduction of the C Factor. As the C factor decreases the power required to pump the wastewater increases.